Diseño del sistema de alcantarillado combinado para el barrio "Los Pinos" ubicado en la parroquia de Cutuglagua del cantón Mejía
The purpose of this project is the applicability of technical concepts of civil and hydraulic engineering for sanitary solutions. The DESIGN OF THE SEWAGE SYSTEM COMBINED FOR THE NEIGHBORHOOD" LOS PINOS "LOCATED IN THE PARISH OF CUTUGLAGUA OF THE CANTON MEJIA, seeks to solve the proble...
Autor Principal: | Cruz Sacoto, Francisco Lizandro |
---|---|
Formato: | bachelorThesis |
Idioma: | spa |
Publicado: |
2018
|
Materias: | |
Acceso en línea: |
http://dspace.ups.edu.ec/handle/123456789/15622 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sumario: |
The purpose of this project is the applicability of technical concepts of civil and hydraulic
engineering for sanitary solutions.
The DESIGN OF THE SEWAGE SYSTEM COMBINED FOR THE NEIGHBORHOOD" LOS
PINOS "LOCATED IN THE PARISH OF CUTUGLAGUA OF THE CANTON MEJIA, seeks to
solve the problems by the deficient management of sewage, wastewater and rainwater in the
neighborhood, since, due to bad hygiene habits, obsolete sanitary systems, unplanned population
growth and direct discharges without treatment, these generate discomfort of the population, high
rate of diseases due to contact with feces, infectious foci such as septic tanks and sewage concealed
The construction of a combined sewer system with a PVC corrugated pipeline with 1789.91 m is
proposed as a solution. Ø of 300 mm, 1088.23 m. Ø of 400 mm, 183.09 m. Ø of 500 mm. and
113.70 m. Ø 700 mm, plus the construction of 60 inspection wells, 1 special flow separator well,
1 pre-treatment well, RAFA treatment plant (Upflow Anaerobic Reactor), 1 muddy pool, 1
chlorination pool and final discharge, with a construction time of 12 months and a constructive
amount of 455,271.52 $ (Four hundred and fifty five thousand two hundred and seventy one
dollars, with fifty two cents), the work will have a useful life of 30 years , totally reversing the
environmental impact and increasing the conditions and quality of life of a future population of
4441 inhabitants located in 299 lots of land, covering an area of 12.37 Ha.
It is worth mentioning that the economic indicators of the project, taking into account only the
health factor, qualify the Project as: FEASIBLE INVESTMENT PROJECT |
---|