Implementación de una red de telecontrol para la empresa Calzado Best Cía. Ltda.

The primary objective of this Technical Project is to monitor all the devices locally and remotely in the Company, through the design of a Telecontrol Network we analyze the failures of the network traffic of the Company, we compare the initial conditions of speed of Transmission, bandwidth, respons...

Descripción completa

Autor Principal: Aguas Uvillús, Katherine Pamela
Otros Autores: Alminate Pintado, Johana Carolina
Formato: bachelorThesis
Idioma: spa
Publicado: 2017
Materias:
Acceso en línea: http://dspace.ups.edu.ec/handle/123456789/14617
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Sumario: The primary objective of this Technical Project is to monitor all the devices locally and remotely in the Company, through the design of a Telecontrol Network we analyze the failures of the network traffic of the Company, we compare the initial conditions of speed of Transmission, bandwidth, response time, troughtput and delay, to design a network that allows us to compare the current working conditions with those of the new Telecontrol Network design. Using the Technical Site Survey, it shows the main capacities and vulnerabilities of the company, which determines the best alternative of the modern design, of the Telecontrol Network considering the main standards offered by the KNX Communication Protocol, helping efficiently to the security problem of the Company through a local and a remote monitoring of all departments in the Administrative Area of the Company. With the use of a Raspberry Pi3 reduced board computer and a relay board we are going to centralize all the information sent to control of the new Telecontrol network, it facilitates the real-time monitoring of all the devices that are connected to the network and in this way managing the occupation of the bandwidth and the speed of transmission with the use of the Monitoring Software Axence netTool, which allows us to manage the entire flow of data at the hours of greater concurrence.