Diseño del colector combinado en el margen izquierdo de la quebrada Calihuaycu para la parroquia Pintag, cantón Quito, provincia de Pichincha-Ecuador.

This project is directed to the hydraulic and structural sizing of a combined collector on the left margin of the Calihuaycu creek for the Pintag parish. Analyzing the physical, topographic and geotechnical characteristics of the site. Also, the dimensioning of hydraulic structures that compose it,...

Descripción completa

Autor Principal: Castillo Román, Cristian Jonathan
Otros Autores: Ullaguari Armijos, Edwin Norman
Formato: bachelorThesis
Idioma: spa
Publicado: 2018
Materias:
Acceso en línea: http://dspace.ups.edu.ec/handle/123456789/16077
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Sumario: This project is directed to the hydraulic and structural sizing of a combined collector on the left margin of the Calihuaycu creek for the Pintag parish. Analyzing the physical, topographic and geotechnical characteristics of the site. Also, the dimensioning of hydraulic structures that compose it, such as: inspection wells, jump wells, overpasses with their foundations, a tunnel, flow diversifiers with their respective discharge and at the end of the collector's route their possible disposal of the sanitary flow to an existing network or in turn the hydraulic dimensioning of a wastewater treatment plant. The hydraulic and structural dimensioning of the collector and its components have been calculated out using updated methods and adhering to current regulations, and then performing a check on specialized software for each design axis. Included in the present work is the impact on the environment with the construction of a combined collector and the value of environmental remediation during its execution. As well as the costs of the civil work and the time it would be built. Through financial economic analysis, it has been determined whether the project is profitable over time or not, evaluating the economic indicators that will justify the execution of this