Diseño de un esquema de reconexión automática para alimentadores primarios en siete subestaciones tipo de la Empresa Eléctrica Quito S.A.
This paper aims to serve as a document for the implementation of the system of reconnection in EEQ. Has become necessary in which to gather information about the failures raised in the specified evaluation period. The result would be to identify the number of failures...
Autor Principal: | Vasco Molina, Jorge Patricio |
---|---|
Formato: | bachelorThesis |
Idioma: | spa |
Publicado: |
2015
|
Materias: | |
Acceso en línea: |
http://dspace.ups.edu.ec/handle/123456789/8067 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sumario: |
This paper aims to serve as a document for the implementation of the system of
reconnection in EEQ. Has become necessary in which to gather information about the
failures raised in the specified evaluation period.
The result would be to identify the number of failures that were cleared by the operation
of the instantaneous overcurrent function in both phases and neutral primary feeders
considered for undergraduate work.
The design was oriented to seven type substations where you can find a variety of
equipment and protective interruption. Which was necessary to identify the
characteristics of equipment breakdown and settings overcurrent and under voltage,
who owns the feeder to know the impact it could have the reconnection of the feeders.
This could work on the design, to establish the number of reconnections that could have
the feeder, the reconnection time it should have, that direct the type of equipment
breakdown and the largest type of load served relationship.
Part of the design is the intervention of control and protection circuits in each of the
primary, in circuits opening, closing and locking. These must have a relationship with
reclosing relay for the operation of reclosing. In different substations are installed relays
FDI, in this case it is necessary to intervene in the operating logic also enable reclose
function. In addition to link protection function whit reclosing relay. As in EEQ has a
SCADA system is important to re-build the communication parameters IEC 618 050 to
have alarms on consoles operation control center, it is necessary to reconfigure the
protocol and update the gateway, which no remote control operation is affected and
work on par with reconnection function enabled. |
---|