Diseño de un sistema de distribución de agua para consumo humano en Sumaco-Cantón Quijos, Provincia de Napo
The purpose of this project is to design a system of safe water distribution in Sumaco- Quijos-Napo. Which has four chapters distributed in the following way: In the chapter one, there is a short description about the geographical location and characteristics of Sumaco parrish. Then it has the gener...
Autor Principal: | Bautista Barrera, Ángel Fernando |
---|---|
Otros Autores: | Samaniego Parra, Pedro Fernando |
Formato: | bachelorThesis |
Idioma: | spa |
Publicado: |
2015
|
Materias: | |
Acceso en línea: |
http://dspace.ups.edu.ec/handle/123456789/9246 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sumario: |
The purpose of this project is to design a system of safe water distribution in Sumaco- Quijos-Napo. Which has four chapters distributed in the following way: In the chapter one, there is a short description about the geographical location and characteristics of Sumaco parrish. Then it has the general statements about the system of safe water distribution. In the chapter two, some alternatives, based in the type of system of safe wáter distribution, the types of piping installation, types of tanks and types of system are planted. Which with the best valuation are chosen; taking into account cost, security, contamination, and the facilities of construction. The chapter three has two sections. The first part has a design of a system of safe water distribution by gravity with 1063 meters length, a system of distribution by closed branches with 379.21 meters length and a tank distribution of 15 cubic meters. The second section consist of waterworks such as: a wet pick box and a disinfection system. This system will provide service to twenty two families and it will be designed to get a life time of twenty years. In the chapter four a detailed budget of each ítems and materials are done, that will have to satisfy the economical needs of public institutions, which will finance its construction in the future. |
---|