Diseño de las obras de derivación del proyecto Río Sur 2
The current titling project responds to an energy demand. The design of the derivation works of the RIO SUR 2 project was elaborated at the feasibility level; It includes the following hydraulic works: the lateral catch with a small dam of 4m high with built-in discharge, a catchment dump that sa...
Autor Principal: | Olalla Remache, Mercy Aydee |
---|---|
Formato: | bachelorThesis |
Idioma: | spa |
Publicado: |
2017
|
Materias: | |
Acceso en línea: |
http://dspace.ups.edu.ec/handle/123456789/14413 |
Etiquetas: |
Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
|
Sumario: |
The current titling project responds to an energy demand. The design of the derivation
works of the RIO SUR 2 project was elaborated at the feasibility level; It includes the
following hydraulic works: the lateral catch with a small dam of 4m high with built-in
discharge, a catchment dump that satisfies the established demand, a channel of
conduction, a sand trap two chamber chambers that allow the washing of sediments
with Diameter Equal to or greater than 0.2mm, a main conduction, a pressure tank,
loading duct and an machine house. For the elaboration of the project it had basic
information: topographic, hydrological, sedimentological, geotechnical, graph of
monthly demand of flows. In the present titling work, 4 catchment alternatives were
formulated and compared; the selection of the most favorable alternative was made in
function technical and economic factors; the design of the selected alternative was
performed. |
---|