Diseño vial definitivo de la Av. Escalón 2

The present work is directed to elaborate the geometric and pavement design of the project called Definitive Road Design of Av. Escalón 2 that starts in Entrance to the neighborhood Muscles and Rails at the height of the water treatment plant potable El Troje with the following North Coordinates:...

Descripción completa

Autor Principal: Ortuño Flores, José Freddy
Otros Autores: Pila Caiza, Segundo David, Viteri Nicolalde, Diego Xavier, Yagchirema Arboleda, Edison Francisco
Formato: bachelorThesis
Idioma: spa
Publicado: 2012
Materias:
Acceso en línea: http://dspace.ups.edu.ec/handle/123456789/1620
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
Sumario: The present work is directed to elaborate the geometric and pavement design of the project called Definitive Road Design of Av. Escalón 2 that starts in Entrance to the neighborhood Muscles and Rails at the height of the water treatment plant potable El Troje with the following North Coordinates: 9963826.641; East: 497679.677 jurisdiction of the Municipality of the South "Zitumbe Zonal Administration", in the Province of Pichincha until linking with the New Avenue Corridor Western with North coordinates: 9963638.137; East: 492434.126, this The project consists of approximately 6,028 kilometers. The present work consists of developing the final design phase that consists of within the macro project of roads proposed by the Municipality of the District Metropolitan of Quito. Step 2 is consolidated in some sections and presents a type S alignment, is composed of ballast in some initial sections and natural soil in others sections, the characteristics of this type of road is indicated in the Metropolitan Ordinance No. 3746 dated June 10, 2008, with a width of 23.00 meters as one via Type Collector. The physical conditions of Step 2 are bad, and in some parts presents an excess of slope, which makes it difficult for vehicles to access simple transmission.